Home
Learn More
Features & Pricing
Success Stories
Contact Us
Search Archives
PRWeb Direct
Submit Release
October 7, 2008
 
Industry Categories  
News by Country  
News by MSA  
Todays News  
Browse by Day  
PR Trackbacks™  
Featured Videos  
ViewNews™  
eBook Digests  
RSS  
PRWeb, a leader in online news and press release distribution, has been used by more than 40,000 organizations of all sizes to increase the visibility of their news, improve their search engine rankings and drive traffic to their Web site.
 
Close Move
All Press Releases for May 20, 2008 Subscribe to this News Feed      
 

New Engineered Foundation Systems May End Defects in Factory-Built Homes

Sure Safe EFS announced the national availability of its new engineered foundation systems (EFS).

Escondido, CA (PRWEB) May 20, 2008 -- Sure Safe EFS announced the national availability of its new engineered foundation systems (EFS).

Art Angelo, Sure Safe EFS president & CEO, said the system has been in test-use since 1994 and has proven to eliminate defects caused by improper setting of modular and HUD-Code home on faulty foundations.

Most clever solution to creating permanent foundations for factory-built homes.
Angelo's announcement came a few days after the release of the Fannie Mae MH Select Initiative at the Manufactured Housing's Institute's 19th Annual Congress at the Paris Hotel in Las Vegas. The Fannie Mae initiative states, "If a manufactured (HUD-Code home) looks site built and has financing like site-built, the mortgage supporting the asset will perform like site-built".

Key provisions in the initiative call for a high-quality MH product by Fannie Mae and specifies a permanent foundation under the factory-built homes. According to some experts the Sure Safe EFS foundation is said to hold the key to "fault-free HUD-Code home installations." One expert even termed it to be the, "Most clever solution to creating permanent foundations for factory-built homes."

Angelo explained that the foundation incorporates a Steel Buttress™ foundation that has performed flawlessly since 1994. The foundation can be installed in a matter of four to six hours with the cost running at a low four figure range compared to many other systems, most of which are not compliant, but often cost up to $25,000 or more.

Angelo said the basic premise of the Sure Safe EFS System is to engage the natural laws of physics by allowing gravity to dynamically transfer the load of the HUD-Code and modular buildings to the footings. The first step in this process is to pre-level the home on temporary supports. Then, the galvanized steel buttress piers are structurally connected to the I-beams or floors under the structure with the bottom of the piers suspended above the grade about three to five inches.

Once all of the steel buttresses are in place below the home the base of the steel piers are inserted into the geotextile form footing bags three to five inches above the grade.

Next, ready-mixed concrete is pumped into the form bags. This brings the Steel Buttress piers into perfect alignment with the center of gravity as the form footing bag literally molds itself to the exact shape of the ground below.

Not only will the Sure Safe EFS Foundation System work with new homes but it also has been successfully tested on scores of existing HUD-Code homes around the nation with equally successful results.

Frequently when HUD-Code or modular homes are set improperly on non-level foundations, a considerable number of defects occur such as cracked drywall, sticking doors and windows and uneven floors. The Sure Safe EFS is warranted to maintain the home dead-level so non-level defects almost cannot happen.

Still another reason to have a properly set HUD-Code home is the new Dispute Resolution Program announced by the Department of Housing and Urban Development. This new program makes all parties in the home manufacturing and delivery system, which includes manufacturers, transporters, setters and dealer/builders, responsible for resolving complaints raised by homeowners. Some penalties are severe.

"We believe," says Angelo, "the use of the Sure Safe EFS System under homes will make a vast improvement in the quality of modular and HUD-Code homes for all of the people who buy them."

Angelo also said that distributorships now are available both domestically and in some foreign lands for the Sure Safe EFS Foundation System.

For additional information contact the Sure Safe EFS web site at www.suresafe.com or call 1-800-322-1999.

From: Sure Safe EFS
Contact: Art Angelo
Phone: 800-322-1999 ext. 108
E-Mail: art @ suresafe.com
www.suresafe.com

# # #

See the original story at: http://www.prweb.com/releases/2008/05/prweb937184.htm

Post Comment:
Trackback URL: http://www.prweb.com/pingpr.php/RW1wdC1DcmFzLVN1bW0tU3F1YS1DcmFzLVplcm8=

Technorati Tags

Bookmark -  Del.icio.us | Digg | Furl It | Spurl | RawSugar | Simpy | Shadows | Blink It | My Web


Other Releases by this Member
OPTIONS
Printer Friendly Version
Download PDF Version
Download Reader Version
BlogThis
ShareIt

Share The News

Submit this press release easily to any of these major bookmarking and social media sites.

CONTACT INFORMATION
Art Angelo
Sure Safe EFS
800-322-1999 +108
Email us Here
ATTACHED FILES

Technician completes bolting the Sure Safe steel buttress to the .steel chassis beam under a HUD-Code home. Note how the base of the galvanized steel buttress is enclosed by the patented geotextile form bag.

Technician completes bolting the Sure Safe steel buttress to the .steel chassis beam under a HUD-Code home. Note how the base of the galvanized steel buttress is enclosed by the patented geotextile form bag.

The concrete fills the bag forming a solid concrete attachment measuring approximately 6-1/4 sq. ft. At the right one of the temporary supported jacks is seen which is utilized lit level and hold the home firmly until the concrete hardens in the permanent.

The concrete fills the bag forming a solid concrete attachment measuring approximately 6-1/4 sq. ft. At the right one of the temporary supported jacks is seen which is utilized lit level and hold the home firmly until the concrete hardens in the permanent.

Close-up shows how concrete completely fills the geotextile bays and seeps through the bottom to form a concrete connection lo the earth.

Close-up shows how concrete completely fills the geotextile bays and seeps through the bottom to form a concrete connection lo the earth.

ABOUT PRESS RELEASES
If you have any questions regarding information in these press releases please contact the company listed in the press release. Please do not contact PRWeb. We will be unable to assist you with your inquiry. PRWeb disclaims any content contained in these releases. Our complete disclaimer appears here.
 
Disclaimer: If you have any questions regarding information in these press releases please contact the company listed in the press release.
Please do not contact PRWeb®. We will be unable to assist you with your inquiry.
PRWeb® disclaims any content contained in these releases. Our complete disclaimer appears here.

© Copyright 1997-2008, Vocus PRW Holdings, LLC.
Vocus, PRWeb and Publicity Wire are trademarks or registered trademarks of Vocus, Inc. or Vocus PRW Holdings, LLC.

Terms of Service | Privacy Policy | Copyright